Then waterproofing again, and only in the end, wooden boards.

A widely recognized collection for machine learning tasks.
Post Reply
zihadhosenjm40
Posts: 517
Joined: Sat Dec 21, 2024 3:30 am

Then waterproofing again, and only in the end, wooden boards.

Post by zihadhosenjm40 »

On one of the short walls, space is left for a door.
A space is provided on any wall for a window, so that a frame with glass can be subsequently installed there.
The internal paneling begins with boards, trims or pallets. They are fixed to the frame with nails. There should not be too large gaps between adjacent elements. At this stage, all surfaces except the floor should be covered with boards.
When cladding, it is necessary to avoid gaps between the boards.

Once the interior finishing is complete, the walls are planed to remove snags and splinters that could be dangerous to livestock.
The plane will help make the wooden paneling smooth and even, and remove all snags.

Now the insulation is laid. If polyurethane foam is selected, which is sold in the form of squares with sides of 50 centimeters, then it is attached to the wood with assembly glue. Choose the one that is suitable for interaction with wood. Information about this should be indicated on the product packaging. Cover all surfaces except the floor.
To insulate with mineral wool, you will have to make a plank office 365 data with the distance between the boards 1–2 mm less than the width of the slabs so that the slabs are embedded as tightly as possible

The insulation is covered with waterproofing. If mats or membranes are used, they are attached to the insulation with assembly glue. The protective layer is removed from self-adhesive waterproofing and applied with a sticky coating to the insulation. This is how the walls and ceiling are covered. Waterproofing can also be attached with a stapler.
Now they start installing the floor. To do this, a layer of waterproofing is laid on the wooden boards. The insulation is attached to it (preferably in 2 layers, even if it is polyurethane foam, so that it is as comfortable as possible inside). From above, the insulation is waterproofed again and covered with wooden boards. An additional layer of waterproofing is necessary so that the waste products of animals do not leak to the insulation.
First, waterproofing is laid on the floor, then insulation,

Installing windows and doors. Work is carried out in accordance with the attached installation instructions.
Windows and doors can be of any shape and made of any material.

Next, the boards are secured to the outside of the structure.
It is essential to install waterproofing under the outer cladding.

The final stage is laying the corrugated sheeting on the roof. This is done with an overlap so that water does not flow under the material. You can lay an additional layer of waterproofing coating under the corrugated sheeting. It will not be superfluous.
Corrugated sheeting is the best material for protecting a barn roof from bad weather - it lasts a long time and is inexpensive

Wires are pulled from the wiring outside. They are fixed to the walls and ceiling to make lighting. Inside, a switch and socket are installed on one of the walls. A heating device can be plugged into the socket in the winter if it gets very cold in the barn.
Post Reply